Data Center Feasibility Study in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
What SBA's own loan files show about data center lending in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area, and what a feasibility study for a project there has to test.
Fourth in the nation, but small loans
Washington-Arlington-Alexandria ranks 4 of 169 nationally for data center loans, and a 2.48x location quotient puts data centers at a multiple of their national weight in local lending, yet within the metro's own mix it sits sixteenth, 16 of 39. The loans are modest for a trade that is often imagined as heavy industry: 39 loans and $23.9 million across FY2017 to FY2026. Midpoint $249,100, or 1.21x of the national midpoint for the class, with $91,750 to $500,000 covering the inner half of loans in the Washington area.
Data processing and hosting firms share the code, and colocation buildings are inseparable from hosting services, so the figures plausibly describe small technology service companies far more than hyperscale campuses. The franchise share is 0.00%. A study of a purpose-built facility cannot lean on this record for its scale.
Holders and the geography
The 7(a) table lists Manufacturers and Traders Trust Company (13 loans, $5.7 million), Newtek Bank, National Association (7 loans, $5.8 million) and, at the bottom of the count but the top of the dollars, Live Oak Banking Company (5 loans, $8.7 million). No inference about any lender's appetite or standards should be drawn from these holder entries. Montgomery County, MD has 11 loans, Loudoun County, VA 10 and Stafford County, VA 5. The metro reaches into the District, Maryland, Virginia and West Virginia, though the named rows fall in only two of the four.
Only two years print: FY2019 with 5 loans and $2.9 million and FY2024 with 8 and $8.4 million. Both loss rates, cancelled and charged off, are held back for Washington data centers, and each blank means withheld, never zero. For Washington data centers, the split by program is withheld on a thin cohort; no 7(a) or 504 figure is given.
What a Washington area data center study has to test
Tenant demand and contract terms, power capacity and price, cooling, connectivity and the physical security the use demands are tested first, with the site compared against the facilities already serving the region. Building and fit-out outlays are weighed against the $249,100 figure, which hints at small operators, and contracted revenue has to cover the debt. Appraisal keeps the operating business and the real estate in separate boxes. Daniel Smith, MAI, signs what Loan Analytics delivers, and a lender, not the study, determines whether a loan is made. The 2023 delineation, applied to each project county, defines the Washington metro; a county it cannot place sends the loan outside every metro.
SBA data center loans in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
| Loans approved, FY2017 to FY2026 | 39 |
|---|---|
| Gross dollars approved | $23.9 million |
| Median loan | $249,100 |
| Middle half of loans, from | $91,750 |
| Middle half of loans, to | $500,000 |
| SBA 7(a) loans | withheld |
| SBA 504 loans | withheld |
| Franchise share of loans | 0.00% |
| Rank among metro and micro areas for data center loans | 4 of 169 |
| Rank of data center among the classes in this area | 16 of 39 |
| Location quotient (share of loans against the national share) | 2.48x |
| Median loan against the national median for the class | 1.21x |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | not reported: fewer than 30 loans in the cohort |
|---|---|
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | withheld |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA data center loans approved in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | withheld | withheld |
| FY2018 | withheld | withheld |
| FY2019 | 5 | $2.9 million |
| FY2020 | withheld | withheld |
| FY2021 | withheld | withheld |
| FY2022 | withheld | withheld |
| FY2023 | withheld | withheld |
| FY2024 | 8 | $8.4 million |
| FY2025 | withheld | withheld |
| FY2026 | withheld | withheld |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| Manufacturers and Traders Trust Company | 13 | $5.7 million |
| Newtek Bank, National Association | 7 | $5.8 million |
| Live Oak Banking Company | 5 | $8.7 million |
Lenders with 5 or more loans here; a lender with fewer is not listed, and loans SBA or a receiver holds are counted but never listed as a lender.
Where the loans are, by county
| County | Loans |
|---|---|
| Montgomery County, MD | 11 |
| Loudoun County, VA | 10 |
| Stafford County, VA | 5 |
Counties with 5 or more loans; smaller ones are not listed.
Metro is the CBSA (metropolitan or micropolitan statistical area) of the loan's project county, July 2023 delineation (OMB Bulletin 23-01). The county is matched by name (manifests/ld2/county-cbsa-map.csv); a loan whose county cannot be placed in a 2023 CBSA is left out of every metro.
Colocation buildings cannot be separated from hosting services.
Shared code: 518210 also holds data processing and hosting businesses.
A value marked withheld rests on fewer than 5 loans, or is withheld so that such a figure cannot be derived from other published figures.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; areas from the U.S. Census Bureau CBSA delineation, July 2023 (OMB Bulletin 23-01); Loan Analytics metro cell MA-47900-C31.
Related feasibility study pages
- Data center feasibility study company
- Feasibility Study Data for the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
- Data Center Feasibility Study in Maryland
- Data Center Feasibility Study in Virginia
- Maryland feasibility studies for SBA and USDA loans
- Feasibility study data and consultants for Virginia
- Feasibility study data and consultants for West Virginia
- Feasibility Study Data by Metro Area
- Feasibility studies for SBA 7(a) and 504 loans
- Data Center Feasibility Study in the New York-Newark-Jersey City, NY-NJ Metro Area
- Data Center Feasibility Study in the Dallas-Fort Worth-Arlington, TX Metro Area
- Data Center Feasibility Study in the Chicago-Naperville-Elgin, IL-IN Metro Area
- Data Center Feasibility Study in the Los Angeles-Long Beach-Anaheim, CA Metro Area
- Data Center Feasibility Study in the Miami-Fort Lauderdale-West Palm Beach, FL Metro Area
- Data Center Feasibility Study in the Austin-Round Rock-San Marcos, TX Metro Area
- Restaurant Feasibility Study in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
- Quick Service Restaurant Feasibility Study in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
- Fitness Center Feasibility Study in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
- Child Care Center Feasibility Study in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
- Beauty Salon Feasibility Study in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
- Auto Repair Shop Feasibility Study in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area
Loan Analytics prepares the feasibility study a lender reads before it commits: for a data center project in the Washington-Arlington-Alexandria, DC-VA-MD-WV Metro Area, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.
Request Scope & Timeline
Start with the data.
Contact Us