Data Center Feasibility Study in Virginia
What SBA's own loan files show about data center lending in Virginia, and what a feasibility study for a project there has to test.
Rank 14 nationally, yet small loans
Virginia stands high among states for SBA data center loans, though the loans are not what the phrase suggests. SBA approved 26 of them between FY2017 and FY2026, totalling $8.9 million, which puts the state 14 of 52. The location quotient of 1.57x reads as data centers weighing more in Virginia approvals than in the national book, but the median loan is just $118,000, 0.57x the national median. Inside the state the class sits 19 of 39. A reader should weigh the small median before assuming large facilities.
Loan sizes and programs
The central band of loans stretches from $100,000 to $349,750, and 24 of the 26 loans used SBA 7(a) against 2 under SBA 504. Franchise brands account for 7.7%. By year, the count was zero in FY2017, FY2020 and FY2023, and rose to 5 in FY2019, 5 in FY2024, 6 in FY2025 and 5 in FY2026. The upturn in recent years is real in the filings, but with such small cohorts a reader should hold the trend lightly.
Who holds the loans, and where
Six 7(a) loans each sit with Newtek Bank, National Association ($1.1 million) and Manufacturers and Traders Trust Company ($770,000); the page shows the present holder as SBA reports it, not a lending policy. Loudoun County has 10 loans, Stafford 5, and Alexandria City, Fairfax and Henrico 2 each. Virginia data centers show no cancellation or charge-off percentage, because Loan Analytics presents a rate only when the cohort holds at least 30 loans, and an empty slot must not be read as nil. One coding limit matters here: colocation buildings share their industry code with other data processing and hosting businesses.
What a Virginia facility study must settle
A study for a data center in Virginia has to begin with power: the utility's capacity and queue, the cost per kilowatt, and the timing of any interconnection. It then tests the tenant side, because colocation income rests on long leases with a few customers, and an empty hall earns nothing. Cooling and water, fibre routes, zoning that may restrict height, noise or generators, and the construction schedule all feed the budget. Lender coverage math needs a case where the halls are only partly leased, and an appraiser will treat the income stream and the specialised building differently, so the study should keep them distinct. Typical loans near $118,000 point to small operators needing a far lighter analysis.
SBA 7(a) and 504 data center loans in Virginia
| Loans approved, FY2017 to FY2026 | 26 |
|---|---|
| Gross dollars approved | $8.9 million |
| Median loan | $118,000 |
| Middle half of loans, from | $100,000 |
| Middle half of loans, to | $349,750 |
| SBA 7(a) loans | 24 |
| SBA 504 loans | 2 |
| Franchise share of loans | 7.7% |
| Rank among states for data center loans | 14 of 52 |
| Rank of data center among classes in Virginia | 19 of 39 |
| Location quotient (share of loans against the national share) | 1.57x |
| Median loan against the national median for the class | 0.57x |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | not reported: fewer than 30 loans in the cohort |
|---|---|
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | not reported: fewer than 30 loans in the cohort |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA 7(a) and 504 data center loans approved in Virginia, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | 0 | $0 |
| FY2018 | 1 | $125,000 |
| FY2019 | 5 | $2.9 million |
| FY2020 | 0 | $0 |
| FY2021 | 2 | $2.4 million |
| FY2022 | 2 | $460,000 |
| FY2023 | 0 | $0 |
| FY2024 | 5 | $1.5 million |
| FY2025 | 6 | $1.1 million |
| FY2026 | 5 | $495,000 |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| Newtek Bank, National Association | 6 | $1.1 million |
| Manufacturers and Traders Trust Company | 6 | $770,000 |
Where the loans are, by county
| County | Loans |
|---|---|
| LOUDOUN | 10 |
| STAFFORD | 5 |
| ALEXANDRIA CITY | 2 |
| FAIRFAX | 2 |
| HENRICO | 2 |
| ARLINGTON | 1 |
| CHESTERFIELD | 1 |
| FAIRFAX CITY | 1 |
| HANOVER | 1 |
| MANASSAS CITY | 1 |
Colocation buildings cannot be separated from hosting services. Shared code: 518210 also holds data processing and hosting businesses.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; Loan Analytics loan-outcome cell SA-VA-C31.
Related feasibility study pages
- Feasibility study data and consultants for Virginia
- Data center feasibility study company
- SBA 7(a) Data Center Feasibility Study
- SBA 504 Data Center Feasibility Study
- Feasibility studies for SBA 7(a) and 504 loans
- Data Center Feasibility Study in California
- Data Center Feasibility Study in Texas
- Data Center Feasibility Study in New York
- Data Center Feasibility Study in Florida
- Data Center Feasibility Study in Illinois
- Data Center Feasibility Study in Ohio
- Restaurant Feasibility Study in Virginia
- Quick Service Restaurant Feasibility Study in Virginia
- Fitness Center Feasibility Study in Virginia
- Hotel Feasibility Study in Virginia
- Auto Repair Shop Feasibility Study in Virginia
- Child Care Center Feasibility Study in Virginia
Loan Analytics prepares the feasibility study a lender reads before it commits: for a data center project in Virginia, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.
Request Scope & Timeline
Start with the data.
Contact Us