Fifth in the country, with small-ticket facilities
Ohio ranks 5 of 52 among states for data center loans, with 39 loans from FY2017 to FY2026 worth $17.3 million, but the class sits 22 of 39 in Ohio's own list and the location quotient is 0.79x. These are small operations: the median loan of $200,000 is 0.97x the national figure, with $100,000 to $400,000 covering most requests. Hosting, managed services and small colocation rooms fit that scale far better than a purpose-built campus.
A Huntington story centered on Columbus
SBA 7(a) carried 38 loans and SBA 504 just 1; no loan is franchised, at 0.00%. The Huntington National Bank dominates, with 21 loans worth $5.6 million, more than half of the file and an average ticket of only a few hundred thousand dollars. No other lender reaches five loans. Franklin County has 17 loans, Cuyahoga 4, Medina 3, and Hamilton, Lorain, Stark and Warren 2 each, so the Columbus area is the center of gravity.
Low cancellation, no published charge-off rate
Slippage is mild in this cell: 3.3% at the floor and 6.7% at the ceiling that includes undisbursed loans, for approvals dated FY2017 to FY2024. Lenders in Ohio have mostly seen approvals through. No charge-off figure is printed since the group of funded loans falls under the 30-loan minimum; that is a blank and not a zero. Approvals have been lumpy, from 7 loans in each of FY2017 and FY2019, down to 1 loan in FY2021 and FY2023, and up to 8 loans worth $3.4 million in FY2025.
Questions an Ohio data center study should answer
Which customers will pay, and under what contract term, comes first, since revenue from a handful of tenants decides repayment. Power price and redundancy, cooling and network carriers are the main cost lines. A study should test what happens to coverage if the largest tenant leaves. Specialised buildings have thin comparables, so the appraisal should be conservative and should show an alternative use.
In this data, colocation space is blended with hosting services, because the entry also takes in data processors who may own no building at all.
SBA 7(a) and 504 data center loans in Ohio
| Loans approved, FY2017 to FY2026 | 39 |
|---|---|
| Gross dollars approved | $17.3 million |
| Median loan | $200,000 |
| Middle half of loans, from | $100,000 |
| Middle half of loans, to | $400,000 |
| SBA 7(a) loans | 38 |
| SBA 504 loans | 1 |
| Franchise share of loans | 0.00% |
| Rank among states for data center loans | 5 of 52 |
| Rank of data center among classes in Ohio | 22 of 39 |
| Location quotient (share of loans against the national share) | 0.79x |
| Median loan against the national median for the class | 0.97x |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | 3.3% |
|---|---|
| The same, counting loans still undisbursed as cancelled (a ceiling) | 6.7% |
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | not reported: fewer than 30 loans in the cohort |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA 7(a) and 504 data center loans approved in Ohio, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | 7 | $1.6 million |
| FY2018 | 4 | $470,000 |
| FY2019 | 7 | $5.8 million |
| FY2020 | 2 | $480,000 |
| FY2021 | 1 | $113,900 |
| FY2022 | 5 | $3.9 million |
| FY2023 | 1 | $350,000 |
| FY2024 | 3 | $984,000 |
| FY2025 | 8 | $3.4 million |
| FY2026 | 1 | $256,700 |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| The Huntington National Bank | 21 | $5.6 million |
Where the loans are, by county
| County | Loans |
|---|---|
| FRANKLIN | 17 |
| CUYAHOGA | 4 |
| MEDINA | 3 |
| HAMILTON | 2 |
| LORAIN | 2 |
| STARK | 2 |
| WARREN | 2 |
| ATHENS | 1 |
| BUTLER | 1 |
| DELAWARE | 1 |
Colocation buildings cannot be separated from hosting services. Shared code: 518210 also holds data processing and hosting businesses.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; Loan Analytics loan-outcome cell SA-OH-C31.
Related feasibility study pages
- Feasibility study data and consultants for Ohio
- Data center feasibility study and SBA loan data
- SBA 7(a) Data Center Feasibility Study
- SBA 504 Data Center Feasibility Study
- SBA feasibility study consultant
- Data Center Feasibility Study in California
- Data Center Feasibility Study in Texas
- Data Center Feasibility Study in New York
- Data Center Feasibility Study in Florida
- Data Center Feasibility Study in Illinois
- Data Center Feasibility Study in Colorado
- Restaurant Feasibility Study in Ohio
- Quick Service Restaurant Feasibility Study in Ohio
- Fitness Center Feasibility Study in Ohio
- Child Care Center Feasibility Study in Ohio
- Auto Repair Shop Feasibility Study in Ohio
- Hotel Feasibility Study in Ohio
Loan Analytics prepares the feasibility study a lender reads before it commits: for a data center project in Ohio, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.
Request Scope & Timeline
Start with the data.
Contact Us