First in the country, with a median above peers
In SBA 7(a) lending for parking facilities California leads all states (1), with 25 approvals from FY2017 to FY2026 totaling $21.5 million, although the class holds only 33 of 39 within California asset types. The median loan of $420,200 reaches 1.68x against parking borrowers elsewhere, the metric that sets the cell apart, while the middle of the book runs from $250,000 to $1.4 million. No franchise brands appear, at 0.00%.
One lender and two counties
Enterprise Bank & Trust is named for 10 loans valued at $6.1 million. Los Angeles County has 9 loans and Riverside County has 7, then Orange, San Diego and San Francisco with 2 each. Volume is uneven, from 6 loans and $4.3 million in FY2018 to none in FY2020, and 4 loans in FY2025 worth $619,700.
Scope and blanks
The code does not split truck lots from car lots, so a yard for tractors and a garage for commuters are counted together. Cancellation and charge-off are both unreported, because the early cohorts are small, and no inference about the class should be drawn from their absence. The useful facts are the high median, the lender named and the concentration in two counties.
What a California parking study has to test
Parking is a land business with few employees, so the study should concentrate on the location and the demand that fills the spaces. It should count stalls, set rates for monthly, daily and event use, and tie occupancy to nearby anchors such as hospitals, offices, airports or venues, with their expected activity. The contract structure matters: whether the owner operates the lot, uses a management company or leases to an operator changes revenue and risk. Land value is the largest component of collateral, so zoning, the possibility of redevelopment and the cost of surface improvements, paving, lighting and equipment, should be stated. Truck parking and car parking have different layouts and customers, and the study should say which applies. With a median of $420,200 higher than peers, a loan likely includes the real estate. Coverage should hold if demand falls, as remote work or construction nearby may change the pattern, and the appraisal should show what the land would be worth in an alternative use.
SBA 7(a) parking lot and garage loans in California
| Loans approved, FY2017 to FY2026 | 25 |
|---|---|
| Gross dollars approved | $21.5 million |
| Median loan | $420,200 |
| Middle half of loans, from | $250,000 |
| Middle half of loans, to | $1.4 million |
| Franchise share of loans | 0.00% |
| Rank among states for SBA 7(a) parking lot and garage loans, by number of loans | 1 |
| Rank of parking lot and garage among classes in California | 33 of 39 |
| Median loan against the national SBA 7(a) median for the class | 1.68x |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | not reported: fewer than 30 loans in the cohort |
|---|---|
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | not reported: fewer than 30 loans in the cohort |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA 7(a) parking lot and garage loans approved in California, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | 1 | $150,000 |
| FY2018 | 6 | $4.3 million |
| FY2019 | 2 | $715,500 |
| FY2020 | 0 | $0 |
| FY2021 | 3 | $6.1 million |
| FY2022 | 4 | $2.4 million |
| FY2023 | 2 | $2.9 million |
| FY2024 | 1 | $2.4 million |
| FY2025 | 4 | $619,700 |
| FY2026 | 2 | $2.0 million |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| Enterprise Bank & Trust | 10 | $6.1 million |
Where the loans are, by county
| County | Loans |
|---|---|
| LOS ANGELES | 9 |
| RIVERSIDE | 7 |
| ORANGE | 2 |
| SAN DIEGO | 2 |
| SAN FRANCISCO | 2 |
| ALAMEDA | 1 |
| FRESNO | 1 |
| MONTEREY | 1 |
Truck parking cannot be separated. Shared code: Truck parking shares 812930 with car parking.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; Loan Analytics loan-outcome cell SAP-CA-C25-7A.
Related feasibility study pages
- California feasibility study company
- Feasibility studies for parking lot and garage projects
- Parking Garage Feasibility Study in California
- SBA 7(a) Parking Garage Feasibility Study
- SBA feasibility study consultant
- SBA 7(a) Restaurant Feasibility Study in California
- SBA 7(a) Quick Service Restaurant Feasibility Study in California
- SBA 7(a) Dental Office Feasibility Study in California
- SBA 7(a) Liquor Store Feasibility Study in California
- SBA 7(a) Auto Repair Shop Feasibility Study in California
- SBA 7(a) Fitness Center Feasibility Study in California
Loan Analytics prepares the feasibility study a lender reads before it commits: for a parking lot and garage project in California, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.
Request Scope & Timeline
Start with the data.
Contact Us