SBA 7(a) Parking Garage Feasibility Study
The national SBA 7(a) record for parking lot and garage projects, from SBA's loan-level files, and what a lender's feasibility study has to test.
Parking: few loans, a high cancellation floor
Parking garages and lots took 118 SBA 7(a) loans and $68.0 million from FY2017 to FY2026. The median is $250,000, with half the loans between $51,275 and $717,250, small sizes that point to operators, equipment and lot improvements more than structured garages. Cancellation is the striking figure: at least 20.5% of the FY2017 to FY2024 parking approvals were cancelled, perhaps 21.6%, high for 7(a), though not far enough above parking lending as a whole, which 7(a) dominates, to pass our distinctness margin.
The code needs a caveat: truck parking shares it with car parking and cannot be separated, so a truck yard and a downtown garage can sit side by side in this record. Enterprise Bank & Trust leads the lenders with 12 loans and $8.0 million; TD Bank, National Association has 10 loans for only $379,400 and Readycap Lending, LLC 6 for $1.0 million. California has 25 loans, Texas 13, New York 10, Florida 9 and Georgia 8. Annual counts have stayed between 6 and 16. Franchise share is 0.85%.
Late losses on a small cohort
The 37 parking loans that funded between FY2017 and FY2021 show a charge-off floor of 2.7%, with none, 0.00%, inside five years; each loss on record arrived later in the term. With a cohort that small, one default moves the rate, and a lender should weigh the cancellation floor more heavily than the loss figure.
What a parking study must test
The study has to say first whether this is car parking or truck parking, because the demand drivers differ entirely. A feasibility study for a 7(a) parking loan then has to test demand from the uses around the site, event calendars and the contracts with monthly parkers; the cost of paving, lighting, gates and payment systems; debt service coverage from transient and monthly revenue, with a case for losing the main demand source nearby; and the appraisal, which for a surface lot often rests on land value and for a garage on income, since a parking structure has little alternative use. A borrower should also expect the lender to ask who else could operate the site if this business fails.
SBA 7(a) parking lot and garage loans in the United States
| Loans approved, FY2017 to FY2026 | 118 |
|---|---|
| Gross dollars approved | $68.0 million |
| Median loan | $250,000 |
| Middle half of loans, from | $51,275 |
| Middle half of loans, to | $717,250 |
| Franchise share of loans | 0.85% |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | 20.5% |
|---|---|
| The same, counting loans still undisbursed as cancelled (a ceiling) | 21.6% |
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | 2.7% |
| Charged off within five years of approval | 0.00% |
| Loans in that cohort | 37 |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA 7(a) parking lot and garage loans approved in the United States, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | 13 | $2.4 million |
| FY2018 | 10 | $5.0 million |
| FY2019 | 6 | $7.2 million |
| FY2020 | 8 | $2.1 million |
| FY2021 | 10 | $8.9 million |
| FY2022 | 10 | $10.9 million |
| FY2023 | 15 | $8.8 million |
| FY2024 | 16 | $8.7 million |
| FY2025 | 14 | $5.4 million |
| FY2026 | 16 | $8.7 million |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| Enterprise Bank & Trust | 12 | $8.0 million |
| TD Bank, National Association | 10 | $379,400 |
| Readycap Lending, LLC | 6 | $1.0 million |
Where the loans are, by state
| State | Loans |
|---|---|
| California | 25 |
| Texas | 13 |
| New York | 10 |
| Florida | 9 |
| Georgia | 8 |
| Puerto Rico | 6 |
| Minnesota | 5 |
| Colorado | 4 |
| Arizona | 3 |
| Iowa | 3 |
Truck parking cannot be separated. Shared code: Truck parking shares 812930 with car parking.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; Loan Analytics loan-outcome cell PA-C25-7A.
Related feasibility study pages
- Parking lot and garage feasibility study company
- SBA loan data for feasibility studies by asset class
- SBA feasibility study company
- SBA 7(a) Restaurant Feasibility Study
- SBA 7(a) Quick Service Restaurant Feasibility Study
- SBA 7(a) Fitness Center Feasibility Study
- SBA 7(a) Auto Repair Shop Feasibility Study
- SBA 7(a) Hotel Feasibility Study
- SBA 7(a) Beauty Salon Feasibility Study
- SBA 7(a) Child Care Center Feasibility Study
- SBA 7(a) Coffee Shop Feasibility Study
SBA 7(a) Parking Garage feasibility study by state
Loan Analytics prepares the feasibility study a lender reads before it commits: for a parking lot and garage project anywhere in the United States, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.
Request Scope & Timeline
Start with the data.
Contact Us