Data Center Feasibility Study in Michigan
What SBA's own loan files show about data center lending in Michigan, and what a feasibility study for a project there has to test.
Michigan: strong rank, weak share
Michigan's data center record contains 27 loans approved from FY2017 to FY2026, with $21.8 million in gross dollars. The state ranks 13 of 52, a respectable position by volume, yet the class is only 25 of 39 inside Michigan, and the location quotient of 0.76x tells us data centers account for a smaller fraction of Michigan lending than they do nationally. A large state can rank high on counts simply because it has many businesses of every kind; the quotient corrects for that and says the class is not a Michigan specialty.
Typical ticket and who holds the loans
The median loan of $185,000 is 0.90x the class norm across the country, and the central band of approvals covers $87,000 to $750,000. The mix is lopsided: 26 loans use SBA 7(a), 1 uses SBA 504, and franchising is nil. In the 7(a) table the only lender listed is The Huntington National Bank, which holds 11 loans worth $3.9 million. Macomb County leads the map with 7 loans, Wayne has 5, Oakland 4, and Grand Traverse, Kent and Washtenaw 2 each; Antrim, Houghton, Livingston and Otsego have 1 each.
Outcome floors withheld
The cohorts of Michigan data center loans hold fewer than 30 loans, which is Loan Analytics' own minimum for showing a cancellation or charge-off rate. Both rates are left off the page, and they are not zero. Because rates in this program are floors that can only rise as open loans mature, a blank is the more honest statement than a hopeful number.
What a study for a Michigan data center must prove
Power comes first: capacity, redundancy and the price per unit at the specific site. Then comes the customer base. A study needs named or credible tenants, contract lengths and the share of capacity that must be leased before the project covers its debt. It should compare building and equipment cost with the usual ticket in this record, which is far below the cost of a large facility, so a bigger project must explain its financing beyond SBA. Debt service coverage should be tested under a slow lease-up and a tenant departure, and the appraisal will depend on contracted revenue, not on square footage alone.
The code that includes colocation also covers hosting and data processing firms, so the loans listed above are a wider group than purpose-built facilities for third-party tenants.
SBA 7(a) and 504 data center loans in Michigan
| Loans approved, FY2017 to FY2026 | 27 |
|---|---|
| Gross dollars approved | $21.8 million |
| Median loan | $185,000 |
| Middle half of loans, from | $87,000 |
| Middle half of loans, to | $750,000 |
| SBA 7(a) loans | 26 |
| SBA 504 loans | 1 |
| Franchise share of loans | 0.00% |
| Rank among states for data center loans | 13 of 52 |
| Rank of data center among classes in Michigan | 25 of 39 |
| Location quotient (share of loans against the national share) | 0.76x |
| Median loan against the national median for the class | 0.90x |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | not reported: fewer than 30 loans in the cohort |
|---|---|
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | not reported: fewer than 30 loans in the cohort |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA 7(a) and 504 data center loans approved in Michigan, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | 4 | $3.1 million |
| FY2018 | 1 | $84,000 |
| FY2019 | 3 | $495,000 |
| FY2020 | 0 | $0 |
| FY2021 | 5 | $4.0 million |
| FY2022 | 4 | $5.7 million |
| FY2023 | 4 | $2.7 million |
| FY2024 | 4 | $669,000 |
| FY2025 | 1 | $50,000 |
| FY2026 | 1 | $5.0 million |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| The Huntington National Bank | 11 | $3.9 million |
Where the loans are, by county
| County | Loans |
|---|---|
| MACOMB | 7 |
| WAYNE | 5 |
| OAKLAND | 4 |
| GRAND TRAVERSE | 2 |
| KENT | 2 |
| WASHTENAW | 2 |
| ANTRIM | 1 |
| HOUGHTON | 1 |
| LIVINGSTON | 1 |
| OTSEGO | 1 |
Colocation buildings cannot be separated from hosting services. Shared code: 518210 also holds data processing and hosting businesses.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; Loan Analytics loan-outcome cell SA-MI-C31.
Related feasibility study pages
- Michigan feasibility study company
- Feasibility studies for data center projects
- SBA 7(a) Data Center Feasibility Study
- SBA 504 Data Center Feasibility Study
- SBA feasibility study consultant
- Data Center Feasibility Study in California
- Data Center Feasibility Study in Texas
- Data Center Feasibility Study in New York
- Data Center Feasibility Study in Florida
- Data Center Feasibility Study in Illinois
- Data Center Feasibility Study in Ohio
- Restaurant Feasibility Study in Michigan
- Quick Service Restaurant Feasibility Study in Michigan
- Liquor Store Feasibility Study in Michigan
- Auto Repair Shop Feasibility Study in Michigan
- Fitness Center Feasibility Study in Michigan
- Hotel Feasibility Study in Michigan
Loan Analytics prepares the feasibility study a lender reads before it commits: for a data center project in Michigan, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.