Gas Station Feasibility Study in Virginia
What SBA's own loan files show about gas station and truck stop lending in Virginia, and what a feasibility study for a project there has to test.
The Virginia gas station file leaks more approvals than almost any other
The distinctive figure for Virginia is cancellation. Of fuel retail loans approved from FY2017 to FY2024, at least 27.3% were cancelled before the money moved, and the ceiling is also 27.3%, so more than a quarter of approved loans never funded as approved. That clears our distinctness screen against both the state's other lending and the class nationally. The second distinctive metric is size: a median loan of $595,950 is only 0.57x the median for the class nationally, with the central half running from $300,500 to $973,975. Across FY2017 to FY2026, 68 loans worth $59.0 million rank Virginia 22 of 53, while a location quotient of 0.53x shows the class is lightly used relative to the national share.
Lenders, programs and geography
SBA 7(a) carried 55 loans and SBA 504 carried 13. Franchise affiliation is 39.7% of loans, so branded fuel and convenience concepts are a large part of the file. Only one lender passes our five-loan line: Celtic Bank Corporation, with 6 loans worth $6.9 million. Within Virginia the class ranks 13 of 39. Hanover County leads with 6 loans, Chesterfield, Henrico and Rockingham have 4 each, and Caroline, Chesapeake City, Danville City and Virginia Beach City have 3 each, a scattered pattern that suggests corridor sites rather than one metro cluster.
Cancellation risk and the unreported charge-off rate
A borrower should read the cancellation floor as a warning about the closing process: environmental review, tank and permit issues, brand approval and appraisal shortfalls are plausible reasons for approved deals to lapse, though the data does not name causes. Virginia's charge-off figure is suppressed. Too few loans were disbursed in the cohort, so we neither print a number nor describe the position as zero. Volume is uneven, with 10 loans and $9.3 million in FY2017, 4 loans in FY2024 and 10 loans in FY2025, and $11.5 million in FY2021 the largest dollar year.
What a Virginia fuel site study must test
A feasibility study should test traffic counts and the fuel gallons a site can pull from competing stations, then the convenience store sales that carry the real margin. Cost should include tanks, canopy, environmental assessment and remediation risk, with a contingency that keeps the schedule from stalling. Coverage should be stressed using conservative fuel margins. The appraisal matters acutely, since a shortfall at appraisal is a plausible route to the cancellations seen in this file.
Two coding limits apply. The code records the borrower's own industry, which keeps travel centers and truck stops inside the group of fuel stations without a store attached. Electrified charging is missing from the 2022 NAICS index entirely.
SBA 7(a) and 504 gas station and truck stop loans in Virginia
| Loans approved, FY2017 to FY2026 | 68 |
|---|---|
| Gross dollars approved | $59.0 million |
| Median loan | $595,950 |
| Middle half of loans, from | $300,500 |
| Middle half of loans, to | $973,975 |
| SBA 7(a) loans | 55 |
| SBA 504 loans | 13 |
| Franchise share of loans | 39.7% |
| Rank among states for gas station and truck stop loans | 22 of 53 |
| Rank of gas station and truck stop among classes in Virginia | 13 of 39 |
| Location quotient (share of loans against the national share) | 0.53x |
| Median loan against the national median for the class | 0.57x |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | 27.3% |
|---|---|
| The same, counting loans still undisbursed as cancelled (a ceiling) | 27.3% |
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | not reported: fewer than 30 loans in the cohort |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA 7(a) and 504 gas station and truck stop loans approved in Virginia, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | 10 | $9.3 million |
| FY2018 | 6 | $4.9 million |
| FY2019 | 5 | $3.3 million |
| FY2020 | 8 | $3.2 million |
| FY2021 | 9 | $11.5 million |
| FY2022 | 8 | $7.6 million |
| FY2023 | 5 | $9.4 million |
| FY2024 | 4 | $2.2 million |
| FY2025 | 10 | $5.0 million |
| FY2026 | 3 | $2.7 million |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| Celtic Bank Corporation | 6 | $6.9 million |
Where the loans are, by county
| County | Loans |
|---|---|
| HANOVER | 6 |
| CHESTERFIELD | 4 |
| HENRICO | 4 |
| ROCKINGHAM | 4 |
| CAROLINE | 3 |
| CHESAPEAKE CITY | 3 |
| DANVILLE CITY | 3 |
| VIRGINIA BEACH CITY | 3 |
| ALBEMARLE | 2 |
| CHARLES CITY | 2 |
The code is the borrower's industry. Truck stop or travel center cannot be split out. EV charging has no entry in the 2022 NAICS index. Shared code: Truck stops and travel centers sit inside 457120 with gas stations that have no convenience store.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; Loan Analytics loan-outcome cell SA-VA-C01.
Related feasibility study pages
- Feasibility study data and consultants for Virginia
- Gas station and truck stop feasibility study company
- SBA 7(a) Gas Station Feasibility Study
- SBA 504 Gas Station Feasibility Study
- SBA Feasibility Study for a Gas Station: What the Lender Tests, and Two Worked Engagements
- SBA feasibility study consultant
- Gas Station Feasibility Study in California
- Gas Station Feasibility Study in Texas
- Gas Station Feasibility Study in Washington
- Gas Station Feasibility Study in Georgia
- Gas Station Feasibility Study in Illinois
- Gas Station Feasibility Study in Wisconsin
- Restaurant Feasibility Study in Virginia
- Quick Service Restaurant Feasibility Study in Virginia
- Fitness Center Feasibility Study in Virginia
- Hotel Feasibility Study in Virginia
- Auto Repair Shop Feasibility Study in Virginia
- Child Care Center Feasibility Study in Virginia
Loan Analytics prepares the feasibility study a lender reads before it commits: for a gas station and truck stop project in Virginia, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.
Request Scope & Timeline
Start with the data.
Contact Us