SBA 7(a) Gas Station Feasibility Study in Arkansas
What SBA's own loan files show about SBA 7(a) lending to gas station and truck stop projects in Arkansas, and what a feasibility study for an SBA 7(a) loan there has to test.
Large tickets and a high cancellation floor
Arkansas gas stations and truck stops borrow big and cancel often. The 47 loans on file come to $62.8 million with a midpoint of $929,000, 0.85x the 7(a) gas-station midpoint nationally; the central half of the loans spans $375,000 to $2.0 million. Arkansas approvals dated through FY2024 lost at least 19.4% to cancellation, the ceiling matching, so about one in five never funded. Arkansas is rank 28 by count nationally; at home, gas and truck stop is 6 of 39. Franchised loans are 17.0%.
The holders and the map
Citizens Bank holds 6 loans with $13.5 million. T Bank, National Association holds 5 loans, but with $16.1 million, so its tickets are very large, and FNBC Bank holds 5 with $1.6 million. Those are holders per SBA today. Sebastian County leads with 9 loans, Benton has 8 and Pulaski 6, putting the western corridor and Little Rock at the center. The year 2019 produced 9 loans worth $10.6 million and FY2025 matched that count with $20.1 million, the largest dollar year in the table.
The coding limits
SBA's code follows the borrower's line of business, so a big travel center cannot be teased apart from a bare pump island in Arkansas, and the 2022 index offers no slot for charging sites. Nothing here identifies an electric charging project. On losses the page prints nothing; the funded cohort did not meet SBA's minimum, and we make no claim.
Testing an Arkansas fuel project
Fuel is a traffic business with a store attached, and the study should start with count data: vehicles per day on the abutting roads, the share that turn in, and the nearest competing pumps. Separate the fuel margin, which is thin and set by the market, from the inside sales and the food service that carry profit. Environmental condition is central: tank age, any past releases and the cost of closure or replacement can decide a deal, so cite a site assessment. Loans at the top quartile reach $2.0 million, which means real estate carries much of the weight; the appraisal must value site and improvements apart from the fuel contract. Coverage should be tested at lower gallons and with a nearby competitor opening. Say whether the project is a branded station.
SBA 7(a) gas station and truck stop loans in Arkansas
| Loans approved, FY2017 to FY2026 | 47 |
|---|---|
| Gross dollars approved | $62.8 million |
| Median loan | $929,000 |
| Middle half of loans, from | $375,000 |
| Middle half of loans, to | $2.0 million |
| Franchise share of loans | 17.0% |
| Rank among states for SBA 7(a) gas station and truck stop loans, by number of loans | 28 |
| Rank of gas station and truck stop among classes in Arkansas | 6 of 39 |
| Median loan against the national SBA 7(a) median for the class | 0.85x |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | 19.4% |
|---|---|
| The same, counting loans still undisbursed as cancelled (a ceiling) | 19.4% |
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | not reported: fewer than 30 loans in the cohort |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA 7(a) gas station and truck stop loans approved in Arkansas, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | 3 | $974,400 |
| FY2018 | 2 | $762,100 |
| FY2019 | 9 | $10.6 million |
| FY2020 | 6 | $6.2 million |
| FY2021 | 4 | $5.9 million |
| FY2022 | 3 | $2.8 million |
| FY2023 | 1 | $457,200 |
| FY2024 | 3 | $6.2 million |
| FY2025 | 9 | $20.1 million |
| FY2026 | 7 | $8.9 million |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| Citizens Bank | 6 | $13.5 million |
| T Bank, National Association | 5 | $16.1 million |
| FNBC Bank | 5 | $1.6 million |
Where the loans are, by county
| County | Loans |
|---|---|
| SEBASTIAN | 9 |
| BENTON | 8 |
| PULASKI | 6 |
| WHITE | 3 |
| ARKANSAS | 2 |
| GARLAND | 2 |
| INDEPENDENCE | 2 |
| SAINT FRANCIS | 2 |
| ASHLEY | 1 |
| CARROLL | 1 |
The code is the borrower's industry. Truck stop or travel center cannot be split out. EV charging has no entry in the 2022 NAICS index. Shared code: Truck stops and travel centers sit inside 457120 with gas stations that have no convenience store.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; Loan Analytics loan-outcome cell SAP-AR-C01-7A.
Related feasibility study pages
- Arkansas feasibility study company
- Gas station and truck stop feasibility study consultant
- SBA Feasibility Study for a Gas Station: What the Lender Tests, and Two Worked Engagements
- Gas Station Feasibility Study in Arkansas
- SBA 7(a) Gas Station Feasibility Study
- SBA feasibility study consultant
- SBA 7(a) Gas Station Feasibility Study in Texas
- SBA 7(a) Gas Station Feasibility Study in California
- SBA 7(a) Gas Station Feasibility Study in Washington
- SBA 7(a) Gas Station Feasibility Study in Georgia
- SBA 7(a) Gas Station Feasibility Study in Illinois
- SBA 7(a) Gas Station Feasibility Study in Wisconsin
- SBA 7(a) Restaurant Feasibility Study in Arkansas
- SBA 7(a) Quick Service Restaurant Feasibility Study in Arkansas
- SBA 7(a) Hotel Feasibility Study in Arkansas
- SBA 7(a) Fitness Center Feasibility Study in Arkansas
- SBA 7(a) Auto Repair Shop Feasibility Study in Arkansas
- SBA 7(a) Child Care Center Feasibility Study in Arkansas
Loan Analytics prepares the feasibility study a lender reads before it commits: for a gas station and truck stop project in Arkansas, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.
Request Scope & Timeline
Start with the data.
Contact Us