SBA 7(a) Data Center Feasibility Study in Minnesota
What SBA's own loan files show about SBA 7(a) lending to data center projects in Minnesota, and what a feasibility study for an SBA 7(a) loan there has to test.
Data centers at small-business scale
Minnesota data centers under 7(a) are not hyperscale campuses. The midpoint of $89,000 is 0.45x the nation's 7(a) data-center figure, and the quartiles sit at only $47,500 and $275,000. The 27 loans total $12.8 million, with the dollar figures lifted by FY2021, when 5 loans carried $5.5 million, and FY2026, when 1 loan carried $4.0 million. No loan is franchised, at 0.00%.
Ranks, holder and places
Minnesota ranks 12 among states by count, while data center is 23 of 39 at home. A single lender appears: U.S. Bank, National Association, with 9 loans and $924,000 on SBA's current-holder list. Counties split evenly at the top, Dakota and Hennepin at 6 each, then Itasca at 4 and Anoka and Stearns at 3, which places the lending around the Twin Cities with a notable presence far to the north.
What the code mixes
Colocation space cannot be isolated from hosting services, and one industry code covers data processing and hosting firms of every kind. A loan in this cell may fund a small hosting firm that rents space or servers, and not a purpose-built colocation facility. Minnesota's cancellation and charge-off percentages are missing, both cohorts being under SBA's minimum.
Power, customers and phasing for a Minnesota facility
Begin with the customer. A colocation or hosting business sells reliability, so the study should show who will buy, on what contract terms, at what price per rack or per megawatt, and what the pipeline looks like. Power is the central constraint: show the utility service available, the cost per unit, the redundancy and the time to energize. Cooling, backup generation, fire suppression and network carriers are major costs and should be itemised with engineering support. Minnesota's cold climate can lower cooling cost, and the study may say so, with data. Show the build-out in phases and the revenue at each phase. A midpoint near $89,000 implies most of these loans are small, so the study needs to state whether the plan converts existing space or constructs a building. Coverage must hold through a slow sales ramp. The appraisal should value the shell for a general user.
SBA 7(a) data center loans in Minnesota
| Loans approved, FY2017 to FY2026 | 27 |
|---|---|
| Gross dollars approved | $12.8 million |
| Median loan | $89,000 |
| Middle half of loans, from | $47,500 |
| Middle half of loans, to | $275,000 |
| Franchise share of loans | 0.00% |
| Rank among states for SBA 7(a) data center loans, by number of loans | 12 |
| Rank of data center among classes in Minnesota | 23 of 39 |
| Median loan against the national SBA 7(a) median for the class | 0.45x |
Cancellation and charge-off
| Cancelled after approval, FY2017 to FY2024 approvals (a floor) | not reported: fewer than 30 loans in the cohort |
|---|---|
| Charged off to date, FY2017 to FY2021 disbursed loans (a floor) | not reported: fewer than 30 loans in the cohort |
Both rates are floors. SBA withholds the status of open loans, so a loan counts as charged off only once SBA reports it; a rate needs at least 30 loans in its cohort and is otherwise not reported.
SBA 7(a) data center loans approved in Minnesota, by fiscal year
| Fiscal year | Loans | Dollars |
|---|---|---|
| FY2017 | 2 | $81,500 |
| FY2018 | 4 | $463,900 |
| FY2019 | 4 | $184,600 |
| FY2020 | 2 | $81,700 |
| FY2021 | 5 | $5.5 million |
| FY2022 | 3 | $515,000 |
| FY2023 | 2 | $389,000 |
| FY2024 | 2 | $550,000 |
| FY2025 | 2 | $995,000 |
| FY2026 | 1 | $4.0 million |
Most active SBA lenders
| Lender | Loans | Dollars |
|---|---|---|
| U.S. Bank, National Association | 9 | $924,000 |
Where the loans are, by county
| County | Loans |
|---|---|
| DAKOTA | 6 |
| HENNEPIN | 6 |
| ITASCA | 4 |
| ANOKA | 3 |
| STEARNS | 3 |
| RAMSEY | 2 |
| BLUE EARTH | 1 |
| BROWN | 1 |
| WRIGHT | 1 |
Colocation buildings cannot be separated from hosting services. Shared code: 518210 also holds data processing and hosting businesses.
Source: U.S. Small Business Administration, 7(a) and 504 loan-level FOIA files (data.sba.gov), as of 2026-09-30; Loan Analytics loan-outcome cell SAP-MN-C31-7A.
Related feasibility study pages
- Feasibility study data and consultants for Minnesota
- Feasibility studies for data center projects
- Data Center Feasibility Study in Minnesota
- SBA 7(a) Data Center Feasibility Study
- SBA feasibility study company
- SBA 7(a) Data Center Feasibility Study in California
- SBA 7(a) Data Center Feasibility Study in Texas
- SBA 7(a) Data Center Feasibility Study in New York
- SBA 7(a) Data Center Feasibility Study in Florida
- SBA 7(a) Data Center Feasibility Study in Ohio
- SBA 7(a) Data Center Feasibility Study in Illinois
- SBA 7(a) Restaurant Feasibility Study in Minnesota
- SBA 7(a) Quick Service Restaurant Feasibility Study in Minnesota
- SBA 7(a) Fitness Center Feasibility Study in Minnesota
- SBA 7(a) Auto Repair Shop Feasibility Study in Minnesota
- SBA 7(a) Beauty Salon Feasibility Study in Minnesota
- SBA 7(a) Brewery, Winery and Distillery Feasibility Study in Minnesota
Loan Analytics prepares the feasibility study a lender reads before it commits: for a data center project in Minnesota, financed under SBA 7(a), SBA 504, USDA Business and Industry or a conventional bank loan. Tell us the project and the lender's deadline, and we reply with scope, timeline and fee.
Request Scope & Timeline
Start with the data.